TEP4
Technagon
Description
Download Signed DDF
min. OS version: 10365
Product Description - TEP4 Integration via DDF
The integration of the Technagon TEP4 charging station as a DDF enables seamless integration of this AC charging infrastructure into intelligent building and energy management systems.
The TEP4 is a high-quality AC charging station with two charging points and a power output of up to 2 × 22 kW. It has been specifically developed for (semi-)public use and complies with both metrology regulations and AFIR requirements.
Smart Integration
Via DDF, the TEP4 is integrated as an intelligent device within the E-Mobil system. This allows charging processes, energy flows, and operating states to be centrally visualized, controlled, and automated.
Integration Features:
- Monitoring of charging status and energy consumption
- Control of charging enablement and charging power
- Integration into energy management (e.g. PV surplus charging)
- Integration with scenarios (e.g. peak load avoidance)
- Visualization in the myGEKKO user interface
General Info
| Manufacturer | Type | Protocol | Model | Version | ID |
|---|---|---|---|---|---|
| Technagon | Wallbox | MODBUS TCP (DDF) | 1 | OS-2.3.1 (0.0.10) | 0x0A00007F00010100 |
Documents
DDF Items
| ID | Name | Unit | Type | Direction |
|---|---|---|---|---|
| 0 | CPS | 65= A (no car), 66= B (car connected), 67= C (charging), 68= D (charging with ventilation), 69= E (error), 70= F (communication error) | int | IN |
| 1 | Voltage L1 | V | real | IN |
| 2 | Voltage L2 | V | real | IN |
| 3 | Voltage L3 | V | real | IN |
| 4 | Current L1 | A | real | IN |
| 5 | Current L2 | A | real | IN |
| 6 | Current L3 | A | real | IN |
| 7 | Charging Power | kW | real | IN |
| 8 | Charging Energy | Wh | real | IN |
| 9 | Current Set | A | real | OUT |
| 10 | Power unit | kW | STRING | IN |
| 11 | Energy unit | Wh | STRING | IN |
| 12 | Phase | int | IN | |
| 13 | Quality | int | IN | |
| 14 | Phases available | int | IN | |
| 20 | CPS CP2 | 65= A (no car), 66= B (car connected), 67= C (charging), 68= D (charging with ventilation), 69= E (error), 70= F (communication error) | int | IN |
| 21 | Voltage L1 | V | real | IN |
| 22 | Voltage L2 | V | real | IN |
| 23 | Voltage L3 | V | real | IN |
| 24 | Current L1 | A | real | IN |
| 25 | Current L2 | A | real | IN |
| 26 | Current L3 | A | real | IN |
| 27 | Charging Power | kW | real | IN |
| 28 | Charging Energy | Wh | real | IN |
| 29 | Current Set | A | real | OUT |
| 30 | Power unit | kW | STRING | IN |
| 31 | Energy unit | Wh | STRING | IN |
| 32 | Phase | int | IN | |
| 33 | Quality | int | IN | |
| 34 | Phases available | int | IN | |
| 204 | Info | STRING | IN | |
| 230 | Debug | int | OUT |
Note
*2026-04-23 12:30:57 (hw) ******************************
Last Commit: 81854217 | 2026-04-21 14:14:29
*2026-04-24 06:51:32 (hw) ******************************
Last Commit: 9ace2d31 | 2026-04-24 06:15:35
*2026-04-28 09:48:36 (hw) ******************************
Last Commit: d8f063ee | 2026-04-28 09:46:00
*2026-05-08 17:44:46 (hw) ******************************
Last Commit: ba1780c9 | 2026-05-07 12:41:14
Last Commit: 81854217 | 2026-04-21 14:14:29
*2026-04-24 06:51:32 (hw) ******************************
Last Commit: 9ace2d31 | 2026-04-24 06:15:35
*2026-04-28 09:48:36 (hw) ******************************
Last Commit: d8f063ee | 2026-04-28 09:46:00
*2026-05-08 17:44:46 (hw) ******************************
Last Commit: ba1780c9 | 2026-05-07 12:41:14